ALLOY78
SILICA82
COPPER72
GRID EXPORT0.00 kW
CLEAR SKIES0 W/m²
DAY 0108:30
HELIOS BASIN / OPERATIONS MANUAL

Field guide

● DC string / feeder● Medium-voltage phases● Auxiliary AC● Heat pipe
  1. Wire a PV string. Place 1–10 modules. Use DC cable and connect each module’s positive DC lead to the next module’s negative lead. Connect the last module to a String Protection Box terminal. The rear junction box contains the DC leads and bypass diodes. Each input independently converts the string voltage onto the shared DC feeder.
  2. Protect and export. Each String Protection Box takes 10 strings with separate monitored fuses and an output switch. The inverter accepts up to five DC feeders from String Protection Boxes or turbines. Select the transformation centre to install its inverter, low-voltage protection box and transformer. Install each L1, L2 and L3 link in the transformation centre schematic. Then route each phase through its matching protection cell to the matching grid connector.
  3. Add storage. A battery includes a bidirectional PCS and step-up transformer. Connect it to the main network through its own medium-voltage protection centre. It charges from solar surplus and can support the site or export at night.
  4. Operate the site. Select a unit, then right-click a destination or its work target. Build and cable a worker factory to grow the fleet. At 22% the tracked worker seeks a powered pad or parks and uses its roof panel to recharge. Use the header demolition icon to queue multiple structures, then right-click to exit. Maintenance drones take 30 simulation seconds to assemble. Use their automatic maintenance toggles or assign jobs manually. Thermal scans require a module that is delivering power.
  5. Build a thermal circuit. Pipe flat-plate collectors to a heat store. Build a solar tower before placing heliostats within its field. Adjust a mirror in its panel or use sun tracking. Pipe troughs and towers to a turbine, then wire the turbine’s DC feeder to a transformation centre.

Left-click to select or build. Right-drag to pan or middle-drag to rotate. Use Hide walls in the top header to expose equipment across the site. Scroll to zoom. Click the minimap to jump. Esc clears the current tool. Space pauses.

HELIOS BASIN / GRID SALES

Economy

Cash balance
€0.00
Grid export
0 kWh
Energy sold
0 kWh
Sale tariff
€0.12 / kWh

Grid exports continue when sales are paused. Cash has no spending uses in this build.

HELIOS BASIN / CONFIGURATION

Game options

MICRONETICA / INTERACTIVE SYSTEMS

SOLAR SIM

Surveying Helios Basin…

FIELD BUILD 0.8.0